PROJECT DESCRIPTION

The Bonneville Power Administration (BPA) made the decision to improve about 13.5 miles of access roads along the existing Boyer-Tillamook transmission line in Tillamook and Yamhill counties, Oregon. Based on the final environmental assessment (EA), BPA is issuing a finding of no significant impact (FONSI) and has made a decision to proceed with the project.

The road improvements are needed because the existing access roads for this transmission line are in poor condition. Access road improvements will include resurfacing roads, upgrading drainage and stream crossings, road widening and adding a small amount of new road.

CURRENT STATUS

The final EA, FONSI, and mitigation action plan are available below. If you would like to receive a copy, please call our toll-free document request line at 1-800-622-4519, providing the full project name, your name and complete mailing address.

CONTACT

For environmental information, contact:
Carol Leiter        Toll-free: 800-622-4519
Supervisory Environmental Protection Specialist Direct line: 360-418-8608
Bonneville Power Administration - ECT-4  Email: cpleiter@bpa.gov 
P.O. Box 3621
Portland, Oregon 97208-3621

For project information, contact:
Jim Semrau        Toll-free: 800-622-4519
Project Manager        Direct line: 360-619-6629
Bonneville Power Administration - TEP-TPP-1 Email: jesemrau@bpa.gov 
P.O. Box 61409
Vancouver, Washington 98666-1409

DOCUMENTS

FINAL EA & FONSI
Public Letter (01/24/2014)
Final EA (01/13/2014)
FONSI and Mitigation Action Plan (01/13/2014)

PRELIMINARY EA
Preliminary EA comments received
Public Letter (09/13/2013)
Preliminary EA (September 2013)
Comment Form (09/13/2013)

SCOPING
Scoping comments received
Public Letter (03/05/2013)
Comment Form (03/05/2013)
Project Vicinity Map (02/06/2013)