PROJECT DESCRIPTION

Bonneville Power Administration (Bonneville), in cooperation with the Bureau of Reclamation (Reclamation), proposes to implement a programmatic environmental review for tributary fish and wildlife habitat restoration actions throughout the Columbia River Basin in the states of Oregon, Washington, Idaho, Montana, and northern Nevada. These actions range from those such as fencing and planting; to bridge construction, instream habitat improvements, and stream channel reconstruction. These actions could be funded by Bonneville to mitigate for effects of the development and operation of the Federal Columbia River Power System (FCRPS) on fish and wildlife.

ENVIRONMENTAL REVIEW

To understand the potential environmental impacts of this proposal, Bonneville, in cooperation with Reclamation, prepared a draft environmental assessment (EA) following the procedures of the National Environmental Policy Act (NEPA). The EA programmatically analyzed the impacts of implementing tributary fish and wildlife restoration projects across the Columbia River Basin, facilitating reviews of numerous projects. A no-action alternative was also analyzed in which this programmatic analysis would not be used to facilitate individual project reviews. The EA describes anticipated impacts to natural and human resources and identifies mitigation measures to help avoid or minimize impacts. The draft EA was released for public review and comment in September 2020; 93 comments were received on the draft EA from eight entities. Bonneville, in cooperation with Reclamation, prepared a final EA that provides responses to comments received and includes minor revisions to that analysis. Based on the EA analysis and mitigation measures to help lessen impacts, Bonneville found that the proposed action would not cause any significant impacts, and issued a finding of no significant impact (FONSI) on December 22, 2020.

CURRENT STATUS

Bonneville and Reclamation released its final EA and Finding of No Significant Impact (FONSI). The FONSI includes a Mitigation Action Plan to help avoid or lessen potential impacts. 

 

CONTACT

For project information, contact:
Rob Shull Toll-free: 800-622-4519
Contract Environmental Protection Specialist Direct Line: 503-230-3962
CorSource Technology Group Email: rwshull@bpa.gov 
Bonneville Power Administration - ECF-4
PO Box 3621
Portland, OR 97208 -3621
 
For program management information, contact:
Carolyn Sharp Toll-Free: 800-622-4519
Supervisory Environmental Protection Specialist Direct Line: 503-230-5206
Bonneville Power Administration - ECF-4 Email: casharp@bpa.gov    
PO Box 3621
Portland, OR 97208 -3621

DOCUMENTS

Action Category Supplement Analyses

SA - 34 Island Creation and Expansion (05/22/2023)

Site-Specific Supplement Analyses

SA - 56 Baldwin Creek Fish Passage and Habitat Enhancement Project (07/15/2024)
SA - 55 Camp Creek Reach 1 Project (07/15/2024)
SA - 54 Spring Creek Enhancement Design “Cable Bridge” Site Project (06/24/2024)
SA - 53 Neal Creek Phase 3 Habitat Enhancement Project (06/24/2024)
SA - 52 Mad River Aquatic Habitat Restoration (06/11/2024)
SA - 51 Lostine River Mile 5.7 Habitat Enhancements (06/10/2024)
SA - 50 Last Chance Ranch Phase 1 Modification (05/15/2024)
SA - 49 Lake Creek Planting and Stream Restoration Project (05/06/2024)
SA - 48 Pole Creek Habitat Restoration Project Phase 1 (03/28/2024)
SA - 47 Eagle Valley Ranch Habitat Improvement Project, Subreach 1, Adaptive Management Project (10/10/2023)
SA - 46 Pack River Delta Restoration Project (10/02/2023)
SA - 45 Shitike Creek Headworks Fish Passage Project (09/11/2023)
SA - 44 Rainbow Lake Rotenone Application (08/09/2023)
SA - 43 Lemhi River 2023 Restoration Projects (08/02/2023)
SA - 42 Foley Creek Floodplain Restoration (07/31/2023)
SA - 41 Couse Creek Project Area 78 Fish Habitat Restoration (07/12/2023)
SA - 40 Asotin Creek Project Area 06 Fish Habitat Restoration (07/06/2023)
SA - 39 Finn Rock Floodplain Restoration Phase 2 (07/06/2023)
SA - 38 Upper Grande Ronde River Bowman Habitat Restoration (06/21/2023)
SA - 37 Pahsimeroi River 2023 Restoration Projects (06/16/2023)
SA - 36 Bull Run Creek Mine Tailing Restoration Project (06/01/2023)
SA - 35 Murderers Creek Habitat Improvement Project (05/23/2023)
SA - 33 Upper Nason Creek Stream Restoration (05/18/2023)
SA - 32 Pine Creek Conservation Area Aerial Vegetation Management (05/10/2023)
SA - 31 Silver Falls Habitat Restoration Project (04/10/2023)
SA - 30 Middle Lemhi Hayden Reach Project Phase 1 (09/20/2022)
SA - 29 Yakama Nation's North Fork Manashtash Creek Ground Placement Project (08/10/2022)
SA - 28 Simcoe Creek Passage Project (08/05/2022)
SA - 27 Neal Creek Phase 2 Habitat Enhancement Project (07/25/2022)
SA - 26 Indian Creek Cold Water Refugia Enhancements (07/18/2022)
SA - 25 Lostine Wetland and Side Channel Complex Project (07/12/2022)
SA - 24 Cottonwood Creek Cole-Engle Diversion Project (07/06/2022)
SA - 23 Tex Creek Restoration Project (07/06/2022)
SA - 22 Pahsimeroi River 2022 Restoration Projects (06/27/2022)
SA - 21 Catherine Creek State Park Habitat Enhancement (06/23/2022)
SA - 20 J.R. Palensky Wildlife Area Aquatic Herbicide Treatment for Ludwigia (06/22/2022)
SA - 19 Twisp River and Tributary Restoration Projects (05/24/2022)
SA - 18 Yankee Fork Adaptive Management Sealing Project (05/20/2022)
SA - 17 Upper Big Springs Pond Habitat Improvement Project (10/06/2021)
SA - 16 Windfall Creek Project (09/20/2021)
SA - 15 Hayden Reach Temporary Bridge Installation (09/20/2021)
SA - 14 SEF-16 Fish Screen and Access Bridge Reconstruction  (08/24/2021)
SA - 13 Lower Fry Meadow Restoration Project  (08/23/2021)
SA - 12 Wenas Wildlife Area Aerial Herbicide Applications  (10/05/2021 - updated)
SA - 11 Finn Rock Floodplain Restoration (08/04/2021)
SA - 10 Taneum Ragheart Restoration Project (07/15/2021)
SA - 09 Skinney Creek Restoration  (06/08/2021)
SA - 08 Upper Burns and Angle Point Stream Restoration (06/07/2021)
SA - 07 Muddy Springs Habitat Project (05/26/2021)
SA - 06 Lolo Creek Bank Project (05/26/2021)
SA - 05 Jim Brown Creek BDAs and PALS Project (05/26/2021)
SA - 04 Morgan Creek S-22 Crossing Reconstruction (05/26/2021)
SA - 03 Tucannon Project Area 13 (05/24/2021)
SA - 02 Alder Creek Floodplain Restoration (05/04/2021)
SA - 01 Pahsimeroi River 2021 Restoration Projects (04/14/2021)  

FINAL EA & FONSI
Final EA  (Dec, 22, 2020)
FONSI/Mitigation Action Plan  (Dec. 22, 2020)
Public Letter         (Dec. 22, 2020)

DRAFT EA
Comments received
Public Letter (Sept. 3, 2020)
Comment Form         (Sept. 3, 2020)
Draft EA (Sept. 2020)

SCOPING
Comments received
Public Letter (Nov. 1, 2019)
Comment Form         (Nov. 1, 2019)